Skip to main content

Royal Canadian Sea Cadets · Phase Three

C121.04 Complete a marling hitch

PO 321 – Rig a lifting device

From Phase One, offered under PO 321 at Phase Three

Source

Extracts of the official PDFs covering only this EO, stamped on every page with their source and cache date. They are convenience copies, not the publication of record.

  • Instructional Guide (IG) A-CR-CCP-601/PF-001 pp. 1199–1202 Full official IG ↗

    Copied 2026-11-08 from the official publication (issued 2016-08-31). The official publication is authoritative.

  • Qualification Standard and Plan (QSP) A-CR-CCP-601/PG-001 pp. 287–288 Full official QSP ↗

    Copied 2026-11-08 from the official publication (issued 2016-08-31, Change 1 2019-03-31). The official publication is authoritative.

Performance, conditions and standard

The three essential parts of the EO, from the QSP lesson specification. The standard is what the cadet must achieve; everything below it is how the QSP suggests getting there.

Periods
1 period
Total time
30 min
Method
Demonstration and Performance

Phase One: 1 period Phase Two: 1 period Phase Three: 1 period

Performance

Complete a Marling Hitch

Conditions
Given:
  • Line
  • Spar or pole
  • Supervision
  • Assistance as required

Environmental: Classroom or training area large enough to accommodate the entire group.

Standard · The cadet shall meet this standard

The cadet shall complete a marling hitch.

Lesson objective (IG)
By the end of this lesson the cadet shall have completed a marling hitch.

Assessment

Not assessed: the QSP gives no test details for this EO (N/A).

All Phase Three assessments →

Before the lesson

From the IG's preparation section. Tick them off the night before.

Pre-lesson instructions

No specific preparation beyond the standard reminders.

Standard reminders (every lesson)
  • Resources needed for the delivery of this lesson are listed in the lesson specification located in A-CR-CCP-601/ PG-001, Phase One Qualification Standard and Plan , Chapter 4. Specific uses for said resources are identified throughout the instructional guide within the TP for which they are required.
  • Review the lesson content and become familiar with the material prior to delivering the lesson.

Instructional strategy (lesson specification)

The lesson specification describes the instructional strategy to apply to this EO: supporting teaching points, references, learning activities, estimated timings and assessment directions. They support the standard above; they are not the standard.

Supporting teaching points
TP1 Demonstration and Performance · 25 min

Explain, demonstrate and have the cadets complete a marling hitch.

Ref: A1-004, C1-002, C1-003 (p. 156)

Time
  • Introduction / Conclusion5 min
  • Demonstration and Performance25 min
  • Total30 min
Substantiation

A demonstration and performance was chosen for this lesson as it allows the instructor to explain and demonstrate the skill the cadets are expected to acquire while providing an opportunity for the cadets to practice the skill under supervision.

Training aids
  • Presentation aids (eg, whiteboard / flipchart / OHP / multimedia projector) appropriate for classroom / training area
  • One metre of line
  • Spar or horizontal pole
  • Diagram of the marling hitch
  • Example of completed marling hitch
Learning aids
  • One metre of line per cadet
  • Several spars / posts
References
  • A1-004 B-GN-181-105/FP-E00 Maddison, G.R., Chief of Maritime Staff (1997). CFCD 105 Fleet Seamanship Rigging and Procedures Manual. Ottawa, ON.
  • C1-002 ISBN 0-7858-1446-9 Pawson, D. (2001). Pocket Guide to Knots and Splices. Edison, NJ: Charwell Books, Inc.
  • C1-003 ISBN 11-770973-5 (1972). Admiralty Manual of Seamanship 1964 Volume 1. London, England: Her Majesty's Stationery Office.

After the lesson

Homework / reading / practice

  • The cadets shall be encouraged to continue practicing the marling hitch on their own time in order to maintain their knowledge and skills.

Instructional guide — a starting point for your lesson

In the IG's own words, it "provides instructors with the base means from which to deliver training" and "instructors are also encouraged to modify and / or enhance the activities, as long as they continue to contribute to enabling objective achievement." Build your lesson from it; teach to the standard above.

Show the full text

Plain-text extraction of the IG section for this EO. Images, tables and layout are only in the PDF.

EO C121.04 – COMPLETE A MARLING HITCH

Total Time: 30 min

PREPARATION

PRE-LESSON INSTRUCTIONS

Resources needed for the delivery of this lesson are listed in the lesson specification located in A-CR-CCP-601/ PG-001, Phase One Qualification Standard and Plan , Chapter 4. Specific uses for said resources are identified throughout the instructional guide within the TP for which they are required.

Review the lesson content and become familiar with the material prior to delivering the lesson.

PRE-LESSON ASSIGNMENT

Nil.

APPROACH

A demonstration and performance was chosen for this lesson as it allows the instructor to explain and demonstrate the skill the cadets are expected to acquire while providing an opportunity for the cadets to practice the skill under supervision.

INTRODUCTION

REVIEW

Nil.

OBJECTIVES

By the end of this lesson the cadet shall have completed a marling hitch.

IMPORTANCE

Knowledge of the marling hitch will be beneficial in future training and is needed for more advanced seamanship skills.

Placing diagrams on overheads will allow the cadets to refer to them during demonstration and practicing. Demonstrate the hitch on a jetty, post or other spar.

Have senior cadets circulate through the class to assist any cadets having problems.

Teaching point 1 Explain, demonstrate and have the cadets complete a marling hitch.

Time: 25 min Method: Demonstration and Performance

PURPOSE OF MARLING HITCH

The marling hitch is used for lashing long bundles such as sails, hammocks and awnings. The end of the line is passed down through each half hitch, jamming that part up against the bundle.

Use the following steps to make the marling hitch:

1. Wrap the working end around the object to be bundled with a half hitch.

2. Move the working end along the length of the bundle and make another half hitch.

3. Repeat this process until the bundle is lashed as far along as required.

CFCD 105 Seamanship Rigging and Procedures Manual

Figure 1 Marling Hitch

END OF LESSON CONFIRMATION

The cadets’ participation in the activity will serve as the confirmation of this lesson.

CONCLUSION

HOMEWORK/READING/PRACTICE

The cadets shall be encouraged to continue practicing the marling hitch on their own time in order to maintain their knowledge and skills.

METHOD OF EVALUATION

Nil.

CLOSING STATEMENT

The marling hitch can be used in a variety of cadet training activities; therefore it is important that the cadets become proficient with it.

INSTRUCTOR NOTES/REMARKS

Nil.

REFERENCES

A1-004 B-GN-181-105/FP-E00 Maddison, G.R., Chief of Maritime Staff (1997). CFCD 105 Fleet Seamanship Rigging and Procedures Manual. Ottawa, ON.

C1-002 ISBN 0-7858-1446-9 Pawson, D. (2001). Pocket Guide to Knots and Splices . Edison, NJ: Charwell Books, Inc.

C1-003 ISBN 11-770973-5 (1972). Admiralty Manual of Seamanship 1964 Volume 1 . London, England: Her Majesty's Stationery Office.