tying a star knot
This EO is superseded
Level 5 training was replaced by the Advanced Leadership Program (ALP) from September 2024 (CANCDTGEN 019/24). This page is kept for reference only; do not use it to plan current training.
Royal Canadian Sea Cadets · Phase Five
C521.01 Complete a ropework project
PO 521 – Complete a ropework project
Superseded
Source
Extracts of the official PDFs covering only this EO, stamped on every page with their source and cache date. They are convenience copies, not the publication of record.
-
Instructional Guide (IG) A-CR-CCP-605/PF-001 pp. 451–472 Full official IG ↗
Copied 2026-11-08 from the official publication (issued 2016-08-29). The official publication is authoritative.
-
Qualification Standard and Plan (QSP) A-CR-CCP-605/PG-001 pp. 149–150 Full official QSP ↗
Copied 2026-11-08 from the official publication (issued 2016-08-29). The official publication is authoritative.
Performance, conditions and standard
The three essential parts of the EO, from the QSP lesson specification. The standard is what the cadet must achieve; everything below it is how the QSP suggests getting there.
- Periods
- —
- Total time
- 90 min
- Performance
-
Complete a Ropework Project
- Conditions
-
Given:
- Self study package
- Supervision
- Assistance as required
Environmental: Classroom or training area suitable to complete the self study package.
Standard · The cadet shall meet this standard
The cadet shall complete a ropework project by completing a self study package.
Lesson objective (IG)
By the end of this lesson the cadet shall have completed a ropework project.
Assessment
Not assessed: the QSP gives no test details for this EO (N/A).
Before the lesson
From the IG's preparation section. Tick them off the night before.
Pre-lesson instructions
- Resources needed for the completion of this self study package are listed in the lesson specification located in A-CR-CCP-605/PG-001, Phase Five Qualification Standard and Plan , Chapter 4. Specific uses for said resources are identified throughout the self study package within the section for which they are required.
- Photocopy the self study package located at Attachment A and the Prolong Mat Pattern located at Attachment B for each cadet.
Standard reminders (every lesson)
- Self study packages are intended to be completed by the cadet independently. More information about self study packages can be found in the foreword and preface.
- Review the lesson content and become familiar with the material prior to facilitating this lesson.
Instructional strategy (lesson specification)
The lesson specification describes the instructional strategy to apply to this EO: supporting teaching points, references, learning activities, estimated timings and assessment directions. They support the standard above; they are not the standard.
- Supporting teaching points
-
making a prolong mat.
- Time
-
- Self Study90 min
- Total90 min
- Substantiation
-
A self study was chosen for this lesson as it allows the cadet to complete a ropework project at their own learning pace. This encourages the cadet to become more self-reliant and independent by focusing on their own learning instead of learning directed by the instructor.
- Learning aids
- 10 m of 4-mm (3/16-inch) diameter braided line
- Corkboard
- Straight pins
- Cutting tool
- Glue
- Prolong mat pattern
- Remarks
-
Cadets are required to complete only one of the two projects described in this EO to satisfy the minimum requirements for PO 521 (Complete a Ropework Project).
- References
-
- C1-064 ISBN 1-55267-986-1 Budworth, G. (2001). The ultimate encyclopedia of knots & ropework. London, England: Anness Publishing Limited.
- C1-102 Fukuhara, D. (2002). Fancy knotting: An introduction. Vancouver, BC: Author.
- C1-234 ISBN 0-07-059218-7 Smith, H. (1993). The marlinspike sailor. Camden, ME: International Marine
Annexes and attachments
Handouts, worksheets and other aids that belong to this EO in the IG.
-
Annex A – (pp. 455–470) View PDF Official ↗
-
Annex B – Prolong mat pattern (pp. 471–472) View PDF Official ↗
After the lesson
Instructor notes / remarks
- Cadets are required to complete only one of the two projects described in this EO to satisfy the minimum requirements for PO 521 (Complete a Ropework Project).
Instructional guide — a starting point for your lesson
In the IG's own words, it "provides instructors with the base means from which to deliver training" and "instructors are also encouraged to modify and / or enhance the activities, as long as they continue to contribute to enabling objective achievement." Build your lesson from it; teach to the standard above.
Show the full text
Plain-text extraction of the IG section for this EO. Images, tables and layout are only in the PDF.
EO C521.01 – COMPLETE A ROPEWORK PROJECT
Total Time: 80 min
PREPARATION
PRE-LESSON INSTRUCTIONS
Resources needed for the completion of this self study package are listed in the lesson specification located in A-CR-CCP-605/PG-001, Phase Five Qualification Standard and Plan , Chapter 4. Specific uses for said resources are identified throughout the self study package within the section for which they are required.
Self study packages are intended to be completed by the cadet independently. More information about self study packages can be found in the foreword and preface.
Review the lesson content and become familiar with the material prior to facilitating this lesson.
Photocopy the self study package located at Attachment A and the Prolong Mat Pattern located at Attachment B for each cadet.
PRE-LESSON ASSIGNMENT
Nil.
APPROACH
A self study was chosen for this lesson as it allows the cadet to complete a ropework project at their own learning pace. This encourages the cadet to become more self-reliant and independent by focusing on their own learning instead of learning directed by the instructor.
INTRODUCTION
REVIEW
Nil.
OBJECTIVES
By the end of this lesson the cadet shall have completed a ropework project.
IMPORTANCE
It is important for cadets to complete a ropework project so new concepts used in more advanced knot work are introduced in a fun and challenging way.
SELF STUDY PACKAGE INSTRUCTIONS
OBJECTIVE
The objective of this self study package is to have the cadet complete a ropework project.
RESOURCES
• Self study package located at Attachment A,
• 10 m of 4-mm (3/16-inch) diameter braided line,
• Corkboard,
• Straight pins,
• Cutting tool,
• Glue, and
• Prolong Mat Pattern located at Attachment B.
ACTIVITY LAYOUT
Provide the cadet with a classroom or training area suitable to complete the self study package.
ACTIVITY INSTRUCTIONS
1. Provide the cadet with a copy of the self study package located at Attachment A, 10 m of 4-mm (3/16- inch) diameter braided line, corkboard, straight pins, cutting tool, glue and a prolong mat pattern.
2. Allow the cadet 90 minutes to complete the self study package.
3. Provide assistance to the cadet as required.
4. Provide feedback to the cadet on the quality and correctness of the completed project and indicate whether or not they have completed the Enabling Objective (EO).
5. Record the result in the cadet's logbook and Cadet Training Record.
SAFETY
Nil.
END OF LESSON CONFIRMATION
The cadet's completion of the self study package will serve as the confirmation of this lesson.
CONCLUSION
HOMEWORK / READING / PRACTICE
Nil.
METHOD OF EVALUATION
Nil.
CLOSING STATEMENT
Completing a ropework project will be beneficial to the cadets so new concepts used in more advanced knot work are introduced in a fun and challenging way.
INSTRUCTOR NOTES / REMARKS
Cadets are required to complete only one of the two projects described in this EO to satisfy the minimum requirements for PO 521 (Complete a Ropework Project).
REFERENCES
C1-064 ISBN 1-55267-986-1 Budworth, G. (2001). The ultimate encyclopedia of knots & ropework . London, England: Anness Publishing Limited.
C1-102 Fukuhara, D. (2002). Fancy knotting: An introduction . Vancouver, BC: David Fukuhara.
C1-234 ISBN 0-07-059218-7 Smith, H. (1993). The marlinspike sailor . Camden, ME: International Marine
Same subject at other levels
Phase One · PO 121 – Perform basic ropework 7 EOs
- C121.01 Whip the end of a line using a west country whipping 1 period
- C121.02 Whip the end of a line using a sailmaker’s whipping 2 periods
- C121.03 Complete a rolling hitch 1 period
- C121.04 Complete a marling hitch 1 period
- M121.01 Tie knots, bends and hitches 4 periods
- M121.02 Whip the end of a line using a common whipping 2 periods
- M121.03 Coil and heave a line 2 periods