Royal Canadian Sea Cadets · Phase Two

M221.04 Identify components of tackles

PO 221 – Rig tackles

Source

Extracts of the official PDFs covering only this EO, stamped on every page with their source and cache date. They are convenience copies, not the publication of record.

  • Instructional Guide (IG) A-CR-CCP-602/PF-001 pp. 391–408 Full official IG ↗

    Copied 2026-11-08 from the official publication (issued 2015-09-01). The official publication is authoritative.

  • Qualification Standard and Plan (QSP) A-CR-CCP-602/PG-001 pp. 161–164 Full official QSP ↗

    Copied 2026-11-08 from the official publication (issued 2015-09-01, Change 1 2019-03-31). The official publication is authoritative.

Performance, conditions and standard

The three essential parts of the EO, from the QSP lesson specification. The standard is what the cadet must achieve; everything below it is how the QSP suggests getting there.

Periods
2 periods
Total time
60 min
Method
Interactive Lecture, In-Class Activity
Performance

Identify Components of Tackles

Conditions
Given:
  • a single whip tackle
  • a double whip tackle
  • a luff
  • a two-fold purchase
  • labels
  • a load of 22 kg (50 pounds [lbs]) or less
  • supervision
  • assistance as required

Environmental: Suitable classroom facilities or training area large enough to accommodate the entire group.

Standard · The cadet shall meet this standard

In accordance with specified references, the cadet shall:

a. identify parts of a tackle;

b. determine mechanical advantage; and

c. determine if a tackle is rigged to advantage/disadvantage.

Lesson objective (IG)
By the end of this lesson the cadet shall identify components of tackles.

Assessment

Not assessed: the QSP gives no test details for this EO (N/A).

All Phase Two assessments →

Before the lesson

From the IG's preparation section. Tick them off the night before.

Pre-lesson instructions

  • Prepare and rig the tackles that are to be presented during this lesson.
  • Photocopy the labels located at Annex A. Photocopy the handout located at Annex B for each cadet.
Standard reminders (every lesson)
  • Resources needed for the delivery of this lesson are listed in the lesson specification located in A-CR-CCP-602/ PG-001, Chapter 4. Specific uses for said resources are identified throughout the Instructional Guide within the TP for which they are required.
  • Review the lesson content and become familiar with the material prior to delivering the lesson.

Safety

  • N/A.
  • If there is a large group, make additional sets of labels and double whips.

Instructional strategy (lesson specification)

The lesson specification describes the instructional strategy to apply to this EO: supporting teaching points, references, learning activities, estimated timings and assessment directions. They support the standard above; they are not the standard.

Supporting teaching points
TP1 Interactive Lecture · 10 min

Describe tackles, to include:

a. types, to include:

1. single whip;

2. double whip;

3. luff; and

4. two-fold purchase; and

b. their purpose.

Ref: C1-047 (pp. 3-153 to 3-155)

TP2 In-Class Activity · 10 min

Describe the parts of a tackle, to include:

a. standing block;

b. standing part;

c. hauling part;

d. moving block;

e. running part; and

f. load.

Conduct an activity where cadets will label the parts of a tackle

Ref: C1-047 (p. 3-151)

TP3 Interactive Lecture · 20 min

Describe mechanical advantage, to include:

a. what it is;

b. how to determine it; and

c. how to identify if a tackle is rigged to advantage/ disadvantage.

Ref: C1-047 (pp. 3-150 and 3-151)

TP4 Interactive Lecture · 10 min

Describe velocity ratio, to include:

a. what it is;

b. how to determine it; and

Ref: C1-047 (p. 3-151)

Time
  • Introduction / Conclusion10 min
  • Interactive Lecture40 min
  • In-Class Activity10 min
  • Total60 min
Substantiation

a. An interactive lecture was chosen for TP1, TP3 and TP4 as it allows the instructor to introduce components of tackles and generate interest in ropework.

b. An in-class activity was chosen for TP2 as it is an interactive way to provoke thought, stimulate interest, and to confirm the cadets’ comprehension of the parts of the tackle.

Training aids
  • Presentation aids (e.g. whiteboard/flipchart/OHP) appropriate for the classroom/training area
  • A single whip tackle, to include: (1) a single block; (2) two metres of line; and (3) a load of 22 kg (50 lbs) or less
  • A double whip tackle, to include: (1) two single blocks; (2) six metres of line; and (3) a load of 22 kg (50 lbs) or less
  • A luff, to include: (1) a single block; (2) a double block; (3) eight metres of line; and (4) a load of 22 kg (50 lbs) or less
  • A two fold-purchase, to include: (1) two double blocks; (2) 10 metres of line; and (3) a load of 22 kg (50 lbs) or less
  • Labels marked as running part, standing part, hauling part, standing block, moving block and load located at A-CR-CCP-602/PF-001, Chapter 11, Annex F
  • Answer key locatedat A-CR-CCP-602/PF-001, Chapter 11, Annex H
Learning aids
  • A single whip tackle
  • A double whip tackle
  • A luff
  • A two-fold purchase
  • Tape
  • Labels marked as running part, standing part, hauling part, standing block, moving block, and load located at A-CR-CCP-602/PF-001, Chapter 11, Annex F
  • Tackles review handout located at A-CR-CCP-602/PF-001, Chapter 11, Annex G
Remarks

a. The instructor is required to rig the single whip, double whip, luff, and two-fold purchase prior to the start of the lesson.

b. This EO is to be conducted prior to EO M221.05 (Rig Tackles). These EOs should be taught consecutively.

References
  • C1-003 (ISBN 0-11-770973-5) Royal Navy. (1972). Admiralty Manual of Seamanship 1964 (Vol. 1). London, England: Her Majesty’s Stationery.
  • C1-047 (ISBN 0-11-772695-8)/BON-050-002/PT-004 Command of the Defence Council. (1995). BR 67 Admiralty Manual of Seamanship. London, England: HMSO Publications Centre.

Annexes and attachments

Handouts, worksheets and other aids that belong to this EO in the IG.

Instructional guide — a starting point for your lesson

In the IG's own words, it "provides instructors with the base means from which to deliver training" and "instructors are also encouraged to modify and / or enhance the activities, as long as they continue to contribute to enabling objective achievement." Build your lesson from it; teach to the standard above.

Show the full text

Plain-text extraction of the IG section for this EO. Images, tables and layout are only in the PDF.

EO M221.04 – IDENTIFY COMPONENTS OF TACKLES

Total Time: 30 min

PREPARATION

PRE-LESSON INSTRUCTIONS

Resources needed for the delivery of this lesson are listed in the lesson specification located in A-CR-CCP-602/ PG-001, Chapter 4. Specific uses for said resources are identified throughout the Instructional Guide within the TP for which they are required.

Review the lesson content and become familiar with the material prior to delivering the lesson.

Prepare and rig the tackles that are to be presented during this lesson.

Photocopy the labels located at Annex A. Photocopy the handout located at Annex B for each cadet.

PRE-LESSON ASSIGNMENT

N/A.

APPROACH

An interactive lecture was chosen for TP1, TP3, and TP4 as it allows the instructor to introduce components of tackles and to create interest in ropework.

An in-class activity was chosen for TP2 as it is an interactive way to provoke thought, stimulate interest, and to confirm the cadets’ comprehension of the parts of the tackle.

INTRODUCTION

REVIEW

N/A.

OBJECTIVES

By the end of this lesson the cadet shall identify components of tackles.

IMPORTANCE

It is important for cadets to know the components of tackles to understand how to use tackles at the maximum efficiency possible with minimal effort. The concepts surrounding tackles will provide assistance when completing future seamanship based tasks.

Teaching point 1 Describe Tackles

Time: 10 min Method: Interactive Lecture

WHAT IS A TACKLE (PRONOUNCED “TAYCKLE”)?

A purchase is a mechanical device to which an applied pull or force is increased. A tackle is a purchase consisting of a rope rove through a block or multiple blocks, providing assistance to lifting a load. The amount of force of the pull required to lift a load is dependent on the number of sheaves in the blocks and the manner in which the rope is rove through them.

TYPES OF TACKLES

Single Whip. This is a tackle consisting of a line rove through a single block. It is used for hoisting light loads, and where speed of hoisting is an important factor.

B-ON-050-002/PT-004, BR 67 Admiralty Manual of Seamanship (p. 3-154)

Figure 1 Single Whip

Double Whip. This is a tackle consisting of a line rove through two single blocks. It is mainly used for hoisting loads.

Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty’s Stationery Office (p. 3-154)

Figure 2 Double Whip

Luff. This is a tackle consisting of a line rove through a single and double block.

Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty’s Stationery Office (p. 3-155)

Figure 3 Luff

Two-fold Purchase. This is a tackle consisting of a piece of line rove through two double blocks. It is a useful general-purpose tackle, as it provides the greatest assistance of the four tackles described in this lesson.

Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty’s Stationery Office (p. 3-155)

Figure 4 Two-fold Purchase

The type of tackle used will depend on the assigned task. Things to consider will be, blocks available, length of line available, weight of the load, distance the load is to be moved, location, and the strength and number of people available to control the tackle.

CONFIRMATION OF TEACHING POINT 1

QUESTIONS

Q1. What is a single whip tackle?

Q2. What blocks make up a luff?

Q3. What tackle is considered a useful general-purpose tackle?

ANTICIPATED ANSWERS

A1. A line rove through a single block.

A2. A single and a double block.

A3. A two-fold purchase.

Teaching point 2 Describe the Parts of a Tackle

Time: 10 min Method: In-Class Activity

PARTS OF A TACKLE

Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty’s Stationery Office (p. 3-155)

Figure 5 Parts of a Tackle

Standing Block. This block is attached to a fixed surface and does not move when the tackle is being used.

Standing Part. This is the line attached to the standing block and is rove through the moving block.

Hauling Part. This is either hauled or eased out to hoist, lower, or move the load.

Moving Block. This block is attached to the load being hoisted/lowered/moved and moves when the hauling part is pulled or eased out respectively.

Running Part. This is the line that is rove through the moving and standing block.

Load. Any item or load, connected to a tackle, being hoisted or moved from one point to another.

ACTIVITY

Time: 5 min

OBJECTIVE

The objective of this activity is to review the parts of a tackle.

RESOURCES

• Two single blocks.

• Two metres of line.

• A load of 22 kg (50 lbs) or less.

• Tackle labels located at Annex A to this EO.

• Tape.

ACTIVITY LAYOUT

Rig two double whip tackles and place them in the front of the class.

ACTIVITY INSTRUCTIONS

• Divide cadets into two groups.

• Provide each team with a set of tackle labels and tape.

• Assign each group to a double whip.

• Have each group label the double whip.

SAFETY

N/A.

If there is a large group, make additional sets of labels and double whips.

CONFIRMATION OF TEACHING POINT 2

The cadets’ participation in the activity will serve as the confirmation of this TP.

Teaching point 3 Describe Mechanical Advantage

Time: 20 min Method: Interactive Lecture

MECHANICAL ADVANTAGE

The amount by which the pull on the hauling part is multiplied by the tackle is called the mechanical advantage (MA) and, if friction is disregarded, this is equal to the number of parts of line emerging from the moving block.

For the point of this lesson friction will be disregarded.

Figure 6 is an example of the MA in a tackle. There are two lines attached to the moving block, therefore the MA equals two.

Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty’s Stationery Office (p. 3-152)

Figure 6 Mechanical Advantage

The MA will change how heavy the load feels to the person(s) pulling on the hauling part. For example, in Figure 6 the MA equals two. Therefore, the weight felt would equal 50 kg for the 100 kg load, meaning the weight felt is equal to 1/2 the actual weight of the load.

The following formula is an easy way to determine the weight felt by the hauling part.

WEIGHT = (1 / MA) x Actual Load Weight

Example:

MA equals three, load weight equals 300 kg

WEIGHT = (1/3) x 300 kg

WEIGHT = 100 kg

MECHANICAL ADVANTAGE IN TACKLES

Command of Defence Council, BR 67 Admiralty Manual Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty’s Stationery Office (p. 3-154) of Seamanship, Her Majesty’s Stationery Office (p. 3-154)

Figure 7 Single Whip MA Figure 8 Double Whip MA

Command of Defence Council, BR 67 Admiralty Manual Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty’s Stationery Office (p. 3-155) of Seamanship, Her Majesty’s Stationery Office (p. 3-155)

Figure 9 Luff MA Figure 10 Two-Fold Purchase MA

RIGGING TO ADVANTAGE AND DISADVANTAGE

If a tackle from Figure 8 to Figure 10 was flipped upside down there would be an extra part of the line emerging from the moving block. The MA would therefore increase by one. When a tackle is rigged to this maximum MA it is rigged to advantage. When the tackle is rigged as in Figures 8 and 9 it is rigged to disadvantage. The single whip provides no advantage. The weight felt on the hauling part will be the actual weight of the load.

Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty’s Stationery Office (p. 3-155)

Figure 11 Rigging to Advantage and Disadvantage

MA When Rigged to Tackle MA When Rigged to Advantage Disadvantage

Single Whip 1 1

Double Whip 2 3

Luff 3 4

Two-Fold Purchase 4 5

D Cdts 3, 2007, Ottawa, ON: Department of National Defence

Figure 12 Advantage vs. Disadvantage

Normal use of tackles will result in many tackles being rigged to disadvantage as it is easier to pull downwards on the hauling part. To maximize MA, change the direction of pull by reeving the hauling part through an additional single block.

CONFIRMATION OF TEACHING POINT 3

QUESTIONS

Q1. What is the MA of a double whip rigged to disadvantage?

Q2. If the MA equals two and the actual load weight equals 500 kg, what is the weight felt by the hauling part?

Q3. What is the MA of a two-fold purchase when rigged to advantage?

ANTICIPATED ANSWERS

A1. Two.

A2. 250 kg.

A3. Five.

Teaching point 4 Describe Velocity Ratio

Time: 10 min Method: Interactive Lecture

VELOCITY RATIO

The ratio between the distance moved by the hauling part and the distance moved by the moving block is known as velocity ratio (VR) and is always equal to the number of parts of the line coming from the moving block.

The VR is directly related to the amount of MA of a tackle. MA is gained only at the expense of speed of work, or how much you must pull in order to move a load a desired distance. If the MA is increased so is the VR, therefore, requiring more line to move a load the desired distance.

Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty’s Stationery Office (p. 3-152)

Figure 13 Velocity Ratio of a Tackle

In Figure 13, in order to raise the load 0.5 m the hauling part is required to move a distance of 1 m.

If the distance the load must be moved and the VR are known, calculate the hauling part distance using the following formula:

Hauling Part Distance = Distance the Load Must be Moved x VR

Example:

VR equals 2, distance the load must be moved 0.5 m.

Hauling Part Distance = 0.5 m x 2

Hauling Part Distance = 1 m

CONFIRMATION OF TEACHING POINT 4

QUESTIONS

Q1. What is the term for the ratio between the distance moved by the hauling part and the distance moved by the moving block?

Q2. If there are four parts of the line emerging from the moving block, what is the VR?

Q3. What is the hauling part distance required to move a load 20 m, with a tackle that has a VR of two?

ANTICIPATED ANSWERS

A1. Velocity ratio.

A2. Four.

A3. 40 m.

END OF LESSON CONFIRMATION

Have cadets complete the handout located at Annex B.

CONCLUSION

HOMEWORK/READING/PRACTICE

N/A.

METHOD OF EVALUATION

N/A.

CLOSING STATEMENT

The ability to identify the components of a tackle will assist in completing ropework tasks more efficiently with minimal effort. Understanding the concepts surrounding tackles will provide the knowledge to maximize the use of these tackles.

INSTRUCTOR NOTES/REMARKS

N/A.

REFERENCES

C1-003 (ISBN II 770973 5) Royal Navy. (1972). Admiralty Manual of Seamanship 1964 (Vol. 1). London, England: Her Majesty’s Stationery Office.

C1-047 (ISBN 0 11 772695 8) B-ON-050-002/PT-004 Command of the Defence Council. (1995). BR 67 Admiralty Manual of Seamanship . London, England: HMSO Publications Centre.