Supervise while the cadets, as members of a group, rig sheers.
Royal Canadian Sea Cadets · Phase Three
C321.01 Rig sheers
Source
Extracts of the official PDFs covering only this EO, stamped on every page with their source and cache date. They are convenience copies, not the publication of record.
-
Qualification Standard and Plan (QSP) A-CR-CCP-603/PG-001 pp. 235–236 Full official QSP ↗
Copied 2026-11-08 from the official publication (issued 2016-08-29, Change 1 2019-03-31). The official publication is authoritative.
Performance, conditions and standard
The three essential parts of the EO, from the QSP lesson specification. The standard is what the cadet must achieve; everything below it is how the QSP suggests getting there.
- Periods
- 4 periods
- Total time
- 90 min
- Performance
-
Rig Sheers.
- Conditions
-
Given:
- Sheers kit (IAW Chapter 2, )
- Load of 22 kg (50 lbs) or less
- Hard hat
- Knife with lanyard
- Supervision
- Assistance as required
Environmental: Training area large enough to accommodate the entire group.
Standard · The cadet shall meet this standard
The cadet, as a member of a group, shall rig sheers, to include:
a. rigging;
b. responding to commands; and
c. de-rigging.
Assessment
Not assessed: the QSP gives no test details for this EO (N/A).
Instructional strategy (lesson specification)
The lesson specification describes the instructional strategy to apply to this EO: supporting teaching points, references, learning activities, estimated timings and assessment directions. They support the standard above; they are not the standard.
- Supporting teaching points
-
- Time
-
- Introduction/Conclusion10 min
- Practical Activity80 min
- Total90 min
- Substantiation
-
A practical activity was chosen for this lesson as it is an interactive way to introduce the cadets to rigging sheers in a safe and controlled environment. This activity contributes to the development of seamanship skills and knowledge in a fun and challenging setting.
- Training aids
- Sheers kit
- Load of 22 kg (50 lbs) or less
- Learning aids
- Sheers kit
- Load of 22 kg (50 lbs) or less
- Hard hat
- Knife with lanyard
- Remarks
-
a. This EO may be used as additional practice time for EO M321.02 (Rig Sheers).
b. There is no instructional guide for this EO.
- References
-
- C1-049 (ISBN 0-11-771958-7) Royal Navy. (1967). Admiralty Manual of Seamanship 1964 (Vol. 2). Cambridge, England: Her Majesty’s Stationery Office.
Annexes and attachments
Handouts, worksheets and other aids that belong to this EO in the IG.
Related documents
Chapter annexes, appendices and other documents this EO or its PO refers to.
- Qualification Standard and Plan (QSP)Chapter 2, Annex C, Appendix 1 – Lifting device equipment list View PDF Download Official ↗
Instructional guide — a starting point for your lesson
In the IG's own words, it "provides instructors with the base means from which to deliver training" and "instructors are also encouraged to modify and / or enhance the activities, as long as they continue to contribute to enabling objective achievement." Build your lesson from it; teach to the standard above.
Show the full text
Plain-text extraction of the IG section for this EO. Images, tables and layout are only in the PDF.
The instructional guide text for this EO is not available yet. Use the official IG link above.
Same subject at other levels
Phase One · PO 121 – Perform basic ropework 7 EOs
- C121.01 Whip the end of a line using a west country whipping 1 period
- C121.02 Whip the end of a line using a sailmaker’s whipping 2 periods
- C121.03 Complete a rolling hitch 1 period
- C121.04 Complete a marling hitch 1 period
- M121.01 Tie knots, bends and hitches 4 periods
- M121.02 Whip the end of a line using a common whipping 2 periods
- M121.03 Coil and heave a line 2 periods