Skip to main content

Royal Canadian Sea Cadets · Phase One

C121.01 Whip the end of a line using a west country whipping

PO 121 – Perform basic ropework

Source

Extracts of the official PDFs covering only this EO, stamped on every page with their source and cache date. They are convenience copies, not the publication of record.

  • Instructional Guide (IG) A-CR-CCP-601/PF-001 pp. 1187–1190 Full official IG ↗

    Copied 2026-11-08 from the official publication (issued 2016-08-31). The official publication is authoritative.

  • Qualification Standard and Plan (QSP) A-CR-CCP-601/PG-001 pp. 281–282 Full official QSP ↗

    Copied 2026-11-08 from the official publication (issued 2016-08-31, Change 1 2019-03-31). The official publication is authoritative.

Performance, conditions and standard

The three essential parts of the EO, from the QSP lesson specification. The standard is what the cadet must achieve; everything below it is how the QSP suggests getting there.

Periods
1 period
Total time
30 min
Method
Interactive Lecture

Phase One: 1 period Phase Two: 1 period Phase Three: 1 period

Performance

Whip the End of a Line using a West Country Whipping

Conditions
Given:
  • Whipping twine
  • Line
  • Cutting tool
  • Supervision
  • Assistance as required

Environmental: Classroom or training area large enough to accommodate the entire group.

Standard · The cadet shall meet this standard

The cadet shall whip the end of a line using a West Country Whipping.

Lesson objective (IG)
By the end of this lesson the cadet shall have whipped the end of a line, using a west country whipping.

Assessment

Not assessed: the QSP gives no test details for this EO (N/A).

All Phase One assessments →

Before the lesson

From the IG's preparation section. Tick them off the night before.

Pre-lesson instructions

  • Prepare a completed west country whipping to show the cadets.
Standard reminders (every lesson)
  • Resources needed for the delivery of this lesson are listed in the lesson specification located in A-CR-CCP-601/ PG-001, Phase One Qualification Standard and Plan , Chapter 4. Specific uses for said resources are identified throughout the instructional guide within the TP for which they are required.
  • Review the lesson content and become familiar with the material prior to delivering the lesson.

Instructional strategy (lesson specification)

The lesson specification describes the instructional strategy to apply to this EO: supporting teaching points, references, learning activities, estimated timings and assessment directions. They support the standard above; they are not the standard.

Supporting teaching points
TP1 Interactive Lecture · 25 min

Explain, demonstrate and have the cadets whip the end of a line using a west country whipping.

Ref: C1-002 (p. 76)

Time
  • Introduction / Conclusion5 min
  • Demonstration and Performance25 min
  • Total30 min
Substantiation

A demonstration and performance was chosen for this lesson as it allows the instructor to explain and demonstrate the skill the cadets are expected to acquire while providing an opportunity for the cadets to practice the skill under supervision.

Training aids
  • Presentation aids (eg, whiteboard / flipchart / OHP / multimedia projector) appropriate for classroom / training area
  • Diagram of a West Country whipping
  • Line
  • Whipping twine
  • Spar or horizontal pole
  • Example of West Country Whipping
Learning aids
  • One meter of line per cadet
  • Whipping twine
References
  • A1-004 B-GN-181-105/FP-E00 Maddison, G.R., Chief of Maritime Staff (1997). CFCD 105 Fleet Seamanship Rigging and Procedures Manual. Ottawa. ON.
  • C1-003 ISBN 11-770973-5 (1972). Admiralty Manual of Seamanship 1964 Volume 1, London, England: Her Majesty’s Stationery Office.
  • C1-002 ISBN 0-7858-1446-9 Pawson, D. (2001). Pocket Guide to Knots and Splices. Edison, NJ: Charwell Books, Inc.

After the lesson

Homework / reading / practice

  • Encourage the cadets to continue practicing the whipping on their own time to maintain their knowledge and skills.

Instructional guide — a starting point for your lesson

In the IG's own words, it "provides instructors with the base means from which to deliver training" and "instructors are also encouraged to modify and / or enhance the activities, as long as they continue to contribute to enabling objective achievement." Build your lesson from it; teach to the standard above.

Show the full text

Plain-text extraction of the IG section for this EO. Images, tables and layout are only in the PDF.

EO C121.01 – WHIP THE END OF A LINE USING A WEST COUNTRY WHIPPING

Total Time: 30 min

PREPARATION

PRE-LESSON INSTRUCTIONS

Resources needed for the delivery of this lesson are listed in the lesson specification located in A-CR-CCP-601/ PG-001, Phase One Qualification Standard and Plan , Chapter 4. Specific uses for said resources are identified throughout the instructional guide within the TP for which they are required.

Review the lesson content and become familiar with the material prior to delivering the lesson.

Prepare a completed west country whipping to show the cadets.

PRE-LESSON ASSIGNMENT

Nil.

APPROACH

A demonstration and performance was chosen for this lesson as it allows the instructor to explain and demonstrate the skill the cadets are expected to acquire while providing an opportunity for the cadets to practice the skill under supervision.

INTRODUCTION

REVIEW

Nil.

OBJECTIVES

By the end of this lesson the cadet shall have whipped the end of a line, using a west country whipping.

IMPORTANCE

Knowledge of the west country whipping will assist the cadet in future training and is needed to learn more advanced seamanship skills.

Teaching point 1 Explain, demonstrate and have the cadets whip the end of a line using a west country whipping.

Time: 25 min Method: Demonstration and Performance

WEST COUNTRY WHIPPING

The west country whipping is suitable:

• when a line is in water for a great deal of time, as being in water may cause the whipping to become loose;

• for nylon or polyester line, as this type of line can more easily become undone; and

• to mark points on a line. Use the following steps to make the whipping:

1. Centre the whipping twine and pass both ends around the line.

2. Each time the ends of the twine pass each other tie an overhand knot.

3. Finish with a reef knot.

Admiralty Manual of Seamanship, Vol 1

Figure 1 Making a West Country Whipping

Show the cadets the completed west country whipping.

Time: 15 min

OBJECTIVE

The objective of this activity is to have the cadets whip the end of a line using a west country whipping.

RESOURCES

• Line, one per cadet,

• One metre of whipping twine, one per cadet.

• Samples of the whipping in several stages of completion.

• Samples of the completed whipping.

ACTIVITY LAYOUT

Nil.

ACTIVITY INSTRUCTIONS

1. Provide each cadet with a length of line and whipping twine.

2. Demonstrate each of the steps of the whipping.

3. Have each cadet complete each step after it has been demonstrated.

4. Have each cadet practice the whipping.

SAFETY

Nil.

END OF LESSON CONFIRMATION

The cadets’ participation in the activity will serve as the confirmation of this lesson.

CONCLUSION

HOMEWORK/READING/PRACTICE

Encourage the cadets to continue practicing the whipping on their own time to maintain their knowledge and skills.

METHOD OF EVALUATION

Nil.

CLOSING STATEMENT

The west country whipping can be used in a variety of cadet training activities, so it is beneficial for the cadets to become proficient in this skill.

INSTRUCTOR NOTES/REMARKS

Nil.

REFERENCES

A1-004 B-GN-181-105/FP-E00 Maddison, G.R., Chief of Maritime Staff (1997). CFCD 105 Fleet Seamanship Rigging and Procedures Manual. Ottawa, ON.

C1-003 ISBN 11-770973-5 (1972). Admiralty Manual of Seamanship 1964 Volume 1 . London, England: Her Majesty's Stationery Office.

C1-002 ISBN 0- 7858-1446-9, Pawson, Des. (2002). Pocket Guide to Knots & Splices . Edison, NJ: Charwell, Books Inc.