C321.03 Construct field amenities

PO 321 – Perform the duties of a team leader on a weekend bivouac exercise

Source

Extracts of the official PDFs covering only this EO, stamped on every page with their source and cache date. They are convenience copies, not the publication of record.

  • Instructional Guide (IG) A-CR-CCP-703/PF-001 pp. 873–896 Full official IG ↗

    Copied 2026-11-08 from the official publication (issued 2019-09-30). The official publication is authoritative.

  • Qualification Standard and Plan (QSP) A-CR-CCP-703/PG-001 pp. 265–268 Full official QSP ↗

    Copied 2026-11-08 from the official publication (issued 2019-10-31). The official publication is authoritative.

Performance, conditions and standard

The three essential parts of the EO, from the QSP lesson specification. The standard is what the cadet must achieve; everything below it is how the QSP suggests getting there.

Periods
6 periods
Total time
180 min
Method
Demonstration and Performance, Practical Activity
Performance

Construct Field Amenities.

Conditions
Given:
  • Nylon rope
  • Twine
  • 1.8-kg (4-lb) axe with a 91-cm (36-inch) handle
  • 60-cm (24-inch) bow saw
  • Diagrams detailing field amenities construction
  • Supervision
  • Assistance as required

Environmental: Field setting, during daylight hours.

Standard · The cadet shall meet this standard

The cadet, in groups of four, shall construct two field amenities from the following:

a. a swamp bed,

b. a pack frame,

c. a meat-drying rack,

d. a raft, or

e. a tool rack.

Lesson objective (IG)
By the end of this lesson the cadet, as a member of a group of four, shall have constructed two field amenities.

Assessment

Not assessed: the QSP gives no test details for this EO (N/A).

All Silver Star assessments →

Before the lesson

From the IG's preparation section. Tick them off the night before.

Pre-lesson instructions

No specific preparation beyond the standard reminders.

Standard reminders (every lesson)
  • Resources needed for the delivery of this lesson are listed in the lesson specification located in A-CR-CCP-703/ PG-001, Chapter 4. Specific uses for said resources are identified throughout the instructional guide within the TP for which they are required.
  • Review the lesson content and become familiar with the material prior to delivering the lesson.

Pre-lesson assignment

  • Photocopy handouts of field amenities located at Annex B. Each cadet should have a copy of each field amenity.
  • A selection of sticks, boughs and logs in different sizes should be gathered in order to aid cadets in construction and to prevent using live boughs.

Safety

  • Ensure cadets are employing safe tool use at all times.
  • The wood chosen for the field amenities must be strong enough to hold 50 kg of weight.
  • Established boundaries shall be respected at all times.

Instructional strategy (lesson specification)

The lesson specification describes the instructional strategy to apply to this EO: supporting teaching points, references, learning activities, estimated timings and assessment directions. They support the standard above; they are not the standard.

Supporting teaching points
TP1 Demonstration and Performance · 45 min

Explain, demonstrate, and have the cadets practice tying the following:

a. sheer lashing,

b. square lashing,

c. timber hitch,

d. diagonal lashing, and

e. figure-of-eight lashing.

Ref: C2-007 (pp. 180–188)

TP2 Practical Activity · 130 min

Have the cadets, in groups of four, construct two of the following field amenities:

a. a swamp bed,

b. a pack frame,

c. a meat-drying rack,

d. a raft, or

e. a tool rack.

Ref: C2-008 (p. 381), C2-046

Time
  • Introduction and Conclusion5 min
  • Demonstration and Performance45 min
  • Practical Activity130 min
  • Total180 min
Substantiation

a. Demonstration and performance was chosen for TP 1 as it allows the instructor to explain and demonstrate knots and lashings while providing an opportunity for the cadets to practice tying knots and lashings under supervision.

b. A practical activity was chosen for TP 2 as it is an interactive way to allow the cadet to experience building field amenities in a safe, controlled environment. This activity contributes to the development of building skills in a fun and challenging setting.

Training aids
  • Nylon rope
  • Twine
  • 1.8-kg (4-lb) axe with a 91-cm (36-inch) handle
  • 60-cm (24-inch) bow saw
Learning aids
  • Nylon rope
  • Twine
  • 1.8-kg (4-lb) axe with a 91-cm (36-inch) handle
  • 60-cm (24-inch) bow saw
  • Diagrams detailing field amenities construction
Remarks

a. Natural resources found in the field such as fallen or dead wood, are to be used for construction. Instructors are to confirm with local authorities that natural resources may be used for this activity.

b. Each cadet must gather three sticks or poles approximately 2.54 cm (one inch) in diameter prior to this lesson.

c. Field amenities will be disassembled, following construction.

d. The content of this EO is similar to content in C221.02 (Construct Field Amenities, A-CR-CCP-702/ PG-001, Chapter 4, Section 11) and C121.01 (Construct Field Amenities, A-CR-CCP-701/PG-001, Chapter 4, Section 10). It is recommended that these lessons be conducted concurrently.

References
  • C2-007 (ISBN 0-7858-1446-9) Pawson, D. (2001). Pocket Guide to Knots and Splices. Edison, NJ: Chartwell Books Inc.
  • C2-008 (ISBN 0-00-265314-7) Wiseman, J. (1999). The SAS Survival Handbook. Hammersmith, London: HarperCollins Publishers.
  • C2-046 PioneeringProjects.org. (2004). PioneeringProjects.org. Retrieved February 20, 2008, from http://www.pioneeringprojects.org/projects/index.htm.

Annexes and attachments

Handouts, worksheets and other aids that belong to this EO in the IG.

Related documents

Chapter annexes, appendices and other documents this EO or its PO refers to.

After the lesson

Instructor notes / remarks

  • Natural resources found in the field such as fallen or dead wood, are to be used for construction.
  • Instructors are to confirm with local authorities that natural resources may be used for this activity.
  • Each cadet must gather three sticks or poles approximately 2.54 cm (one inch) in diameter prior to this lesson.
  • Field amenities will be disassembled, following construction.
  • The content of this EO is similar to content in C221.02 (Construct Field Amenities, A-CR-CCP-702/PF-001, Chapter 10, Section 11) and C121.01 (Construct Field Amenities, A-CR-CCP-701/PF-001, Chapter 10, Section 10). It is recommended that these lessons be conducted concurrently.

Instructional guide — a starting point for your lesson

In the IG's own words, it "provides instructors with the base means from which to deliver training" and "instructors are also encouraged to modify and / or enhance the activities, as long as they continue to contribute to enabling objective achievement." Build your lesson from it; teach to the standard above.

Show the full text

Plain-text extraction of the IG section for this EO. Images, tables and layout are only in the PDF.

EO C321.03 – CONSTRUCT FIELD AMENITIES

Total Time: 180 min

PREPARATION

PRE-LESSON INSTRUCTIONS

Resources needed for the delivery of this lesson are listed in the lesson specification located in A-CR-CCP-703/ PG-001, Chapter 4. Specific uses for said resources are identified throughout the instructional guide within the TP for which they are required.

Review the lesson content and become familiar with the material prior to delivering the lesson.

PRE-LESSON ASSIGNMENT

Photocopy handouts of field amenities located at Annex B. Each cadet should have a copy of each field amenity.

A selection of sticks, boughs and logs in different sizes should be gathered in order to aid cadets in construction and to prevent using live boughs.

APPROACH

Demonstration and performance was chosen for TP 1 as it allows the instructor to explain and demonstrate knots and lashings while providing an opportunity for the cadets to practice tying knots and lashings under supervision.

A practical activity was chosen for TP 2 as it is an interactive way to allow the cadet to experience building field amenities in a safe, controlled environment. This activity contributes to the development of building skills in a fun and challenging setting.

INTRODUCTION

REVIEW

N/A.

OBJECTIVES

By the end of this lesson the cadet, as a member of a group of four, shall have constructed two field amenities.

IMPORTANCE

It is important for cadets to understand the value of field amenities. Constructing field amenities is a fun way to incorporate knot tying in the field training site and make the site more comfortable. If ever in a survival situation, field amenities are also a way to combat boredom which is one of the seven enemies of survival.

Teaching point 1 Explain, Demonstrate and Have the Cadets Practice Tying Lashings

Time: 45 min Method: Demonstration and Performance

For this skill lesson it is recommended that instruction take the following format:

(1) Explain and demonstrate the complete skill while cadets observe.

(2) Explain and demonstrate each step required to complete the skill. Monitor cadets as they imitate each step.

(3) Monitor the cadets’ performance as they practice the complete skill.

Note: Assistant instructors may be employed to monitor cadet performance.

ROUND LASHING

Also called a sheer lashing, the round lashing has two distinct uses. First, it creates an A-frame or set of sheer legs. Second, two or three round lashings can be used to bind poles together to make a longer horizontal pole.

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 184–185)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 184–185)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 184–185)

Figure 1 (Sheet 1 of 3) Round Lashing

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 184–185)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 184–185)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 184–185)

Figure 1 (Sheet 2 of 3) Round Lashing

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 184–185)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 184–185)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 184–185)

Figure 1 (Sheet 3 of 3) Round Lashing

SQUARE LASHING

A square lashing secures two poles together at 90 degrees. The rope used to make the lashing should be considerably smaller than the size of the poles. For the lashing to be effective, each turn must be pulled as tight as possible as it is made.

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 180-181)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 180-181)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 180-181)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 180-181)

Figure 2 (Sheet 1 of 4) Square Lashing

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 180-181)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 180-181)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 180-181)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 180-181)

Figure 2 (Sheet 2 of 4) Square Lashing

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 180-181)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 180-181)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 180-181)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 180-181)

Figure 2 (Sheet 3 of 4) Square Lashing

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 180-181)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 180-181)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 180-181)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 180-181)

Figure 2 (Sheet 4 of 4) Square Lashing

TIMBER HITCH

The timber hitch is included because it is required for the diagonal lashing. It should not take a great amount of time to complete.

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 139)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 139)

Figure 3 (Sheet 1 of 2) Timber Hitch

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 139)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 139)

Figure 3 (Sheet 2 of 2) Timber Hitch

DIAGONAL LASHING

A diagonal lashing is used at a crossing point, to prevent poles from springing apart.

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 182-183)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 182-183)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 182-183)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 182-183)

Figure 4 (Sheet 1 of 4) Diagonal Lashing

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 182-183)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 182-183)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 182-183)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 182-183)

Figure 4 (Sheet 2 of 4) Diagonal Lashing

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 182-183)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 182-183)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 182-183)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 182-183)

Figure 4 (Sheet 3 of 4) Diagonal Lashing

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 182-183)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 182-183)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 182-183)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 182-183)

Figure 4 (Sheet 4 of 4) Diagonal Lashing

FIGURE-OF-EIGHT LASHING

The figure-of-eight lashing is used to join three poles together, to create a tripod.

When making a figure-of-eight lashing, the poles shall be placed staggered.

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 187–188)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 187–188)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 187–188)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 187–188)

Figure 5 (Sheet 1 of 4) Figure-of-Eight Lashing

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 187–188)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 187–188)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 187–188)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 187–188)

Figure 5 (Sheet 2 of 4) Figure-of-Eight Lashing

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 187–188)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 187–188)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 187–188)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 187–188)

Figure 5 (Sheet 3 of 4) Figure-of-Eight Lashing

D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 187–188)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 187–188)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 187–188)D. Pawson, Pocket Guide to Knots & Splices, Chartwell Books, Inc. (p. 187–188)

Figure 5 (Sheet 4 of 4) Figure-of-Eight Lashing

CONFIRMATION OF TEACHING POINT 1

The cadets’ participation in tying the lashings will serve as the confirmation of this TP.

Teaching point 2 Have the Cadets Construct Two Field Amenities

Time: 130 min Method: Practical Activity

FIELD AMENITIES

Field amenities will be chosen from the following:

• a swamp bed,

• a pack frame,

• a meat-drying rack,

• a raft, and

• a tool rack.

ACTIVITY

OBJECTIVE

The objective of this activity is to construct field amenities for a bivouac site, using the knots and lashings previously taught.

RESOURCES

• nylon rope,

• twine,

• utility cord,

• natural resources, found in the field,

• 1.8–kg (4-lb) axe with a .91–m (36-inch handle),

• .60–m (24-inch) bow saw, and

• diagrams detailing field amenities.

ACTIVITY LAYOUT

N/A.

ACTIVITY INSTRUCTIONS

1. Divide cadets into groups of no more than four.

2. Depending on need and availability of resources, have the cadets choose two field amenities to construct.

3. Distribute instructions located at Annex B. Have the cadets select and use the most effective knots and lashings to make their field amenity.

4. When amenities are completed, view all constructed amenities.

5. Additional resources for field amenities are listed in the Instructions.

6. Depending on local regulations, have the cadets redistribute all material used in the construction.

SAFETY

• Ensure cadets are employing safe tool use at all times.

• The wood chosen for the field amenities must be strong enough to hold 50 kg of weight.

• Established boundaries shall be respected at all times.

CONFIRMATION OF TEACHING POINT 2

The cadets’ participation in the activity will serve as the confirmation of this TP.

END OF LESSON CONFIRMATION

The cadets’ participation in the construction of field amenities in TP 2 will serve as the confirmation of this lesson.

CONCLUSION

HOMEWORK/READING/PRACTICE

N/A.

METHOD OF EVALUATION

N/A.

CLOSING STATEMENT

Field amenities will enhance any base camp. They are relatively easy to construct and are a fun way to reinforce usage of knots. They can make cadets comfortable in the field when it is a home away from home.

INSTRUCTOR NOTES/REMARKS

Natural resources found in the field such as fallen or dead wood, are to be used for construction.

Instructors are to confirm with local authorities that natural resources may be used for this activity.

Each cadet must gather three sticks or poles approximately 2.54 cm (one inch) in diameter prior to this lesson.

Field amenities will be disassembled, following construction.

The content of this EO is similar to content in C221.02 (Construct Field Amenities, A-CR-CCP-702/PF-001, Chapter 10, Section 11) and C121.01 (Construct Field Amenities, A-CR-CCP-701/PF-001, Chapter 10, Section 10). It is recommended that these lessons be conducted concurrently.

REFERENCES

C2-007 (ISBN 0-7858-1446-9) Pawson, D. (2001). Pocket Guide to Knots and Splices . Edison, NJ: Chartwell Books Inc.

C2-008 (ISBN 0-00-265314-7) Wiseman, J. (1999). The SAS Survival Handbook . Hammersmith, London: HarperCollins Publishers.

C2-046 PioneeringProjects.org. (2004). PioneeringProjects.org . Retrieved February 20, 2008, from http:// www.pioneeringprojects.org/projects/index.htm.

Green Star · PO 121 – Participate as a member of a team during an overnight bivouac field training exercise (FTX) 14 EOs

PO 121 – Green Star →

Red Star · PO 221 – Perform the duties of a section member during a weekend bivouac exercise 13 EOs

PO 221 – Red Star →

Master Cadet · PO 521 – Investigate human impact on ecosystems 1 EO

PO 521 – Master Cadet →